Analysis on Dynamic Decision-Making Model of the Enterprise Technological Innovation Investment under Uncertain Environment
Abstract
Under the environment of fuzzy factors including the return of market, performance of product, and the demanding level of market, we use the method of dynamic programming and establish the model of investment decision, in technology innovation project of enterprise, based on the dynamic programming. Analysis of the influence caused by the changes of fuzzy uncertainty factors to technological innovation project investment of enterprise.
1. Introduction
The enterprise technological innovation is a creative process. The uncertainty risk mainly includes the environment, technology, market, and risk management. At the same time, the process of enterprise technological innovation is a dynamic process. In the initial stage of the technical innovation, the enterprise must evaluate and select the innovation project and also consider the social and economic benefits and the development of technology with the combination of their own development strategies; at the end select the most suitable for the development of innovative investment projects. Sarkar [1] had studied market uncertainty and corporate investment relationship in consideration of system risk conditions, and he thinks that increasing the uncertainty may increase the probability of investment of enterprises to some low growth and low risk of investment project. In fact, a technical innovation project can be regarded as embedded in a series of options chain, and each option gives investors investment rights, so every decision stage contains an “improvement option”; when the difficult technology problem definitely is solved, we can make further investment in product prototype development and innovative design and then continue investing to enter the testing phase. At the same time, in every decision stage there is an abandonment option, so the flexibility of project management not only increases the value of the project, but also reduces the investment risk of the technical innovation project. Weeds [2] described if research and development is successful as a Poisson process, and it is used to describe the uncertainty of technology and of Hershey’s bad market opportunity arrival timing. He builds two stages’ R&D investment pricing model and discusses the reality of "Sleeping Patent” rationality; that is, the enterprise is willing to develop a technology, but after the success of the technology research and development, will put it away unheeded and not put it into the market. Mitchell and Hamilton [3] point out that due to R&D plays an important role in creating competitive advantage and, therefore, should be treated from a strategic perspective, discussing in detail the multiple features of the R&D strategic options and then taking three steps: clear strategic aim, evaluation strategy options, and select influence strategic target to study R&D strategy option. Lint and Pennings [4, 5] mainly studied the innovation of real option in the process of marketization and pointed out that there were two choices, disposable rapid advancing, and slow advancing and related options opportunities and options value hid in slow advancing. Huchzermeier and Loch [6] proposed a decision model of multiple stages and considered in each phase of this model that managers had three solutions: continue to invest in the project, improve the project, and give up the project. From the market returns, assumed total return consists of two levels: a basic income can be relatively easy to be obtained; only in the project performance exceeding market demands becomes uncertain. They also identified several different sources of the flexibility and uncertainty and made analysis of the impact problem increased by uncertainty and flexibility. From the characteristics that the state variable of R&D project is a nonfinancial parameter, using an equivalent method, dynamic planning of the option evaluation to build the dynamic programming model of R&D project, without the need for asset replication, Sheng [7] had solved the flexible problem of R&D project well.
The aforementioned is the study conducted under random environment (some discrete environmental). In fact, the essence of fuzzy real option is that tolerance in the same information shows diversification before the rationality and that the complexity of the human mind is admitted, namely, the introduction of nonuniform rational in the value assessment. At the same time, there are often still some realities that we cannot accurate valuation or expect net cash flow situation and due to objective factors some variables cannot be estimated by the exact data, and some actual situation etc (Liu [8]). So evaluation results often deviate from the actual if we use the accurate values to determine model input parameters. In this paper, we mainly combine the dynamic programming method and option analysis method, in a fuzzy environment making an analysis of some flexible decision problems of enterprise technology innovation and innovation investment. Firstly the Huchzermeier and Loch [6] model is extended. Secondly a discussion of dynamic programming model of the second stage under fuzzy environment is made. Thirdly analysis is made about technological innovation project decision model under fuzzy environment. Then the elastic value of the project of technology innovation is discussed. It focuses on the analysis of changes of the fuzzy uncertainty factors (including market returns and demanding level).
2. The Dynamic Programming Decision Model of the Technological Innovation Investment under Fuzzy Environment
2.1. Extending of Huchzermeier and Loch Model
2.2. The Dynamic Programming Model of the Two Stages under Fuzzy Environment
To either possibilities (price changing in stage 0 and stage 1), if V0 > I, then enterprise invests, we can get the net return: F1 = max {V1 − I, 0}.
Previously we discussed the dynamic programming model in Sheng [7] under fuzzy environment. Theoretically speaking, the fuzzy environment is closer to the technical innovation in reality, so this model has certain practical significance. Below we start from Liu [8] model, combine Dixit and Pindyck [9], and make discussion about the multistage model.
2.3. The Decision Model of Technological Innovation Project during Multistages under Fuzzy Environment
2.3.1. Fuzzy Uncertainty of Technological Innovation Project during Development Stage
Investment management of technical innovation project is a decision process of multistages. Each stage has decision points of project evaluation. Each decision point includes the project evaluation at present, investment decision making of the current state, and future earnings evaluation based on each kind of decision-making choice. In this section, we use the fuzzy theory proposed by Liu [8] to handle uncertainty of technical innovation project’s development phase. Firstly the decision model of technology innovation project during multistage is described [7].
Santiago and Vakili Model Assuming totally there are T stages of decision making of technology innovation project, t = 0,1, 2, …, T − 1, in each stage t, decision makers will face three alternatives, “continue” “improvement,” and “give up”. The success of technical innovation project depends on the performance of the product put into market; we use the state variables of the project to show the product performance in the process of the development. Let the Xt project be the state variables in the initial stage t, and assume when t = 0, X0 = 0; ξt is the fuzzy uncertainty of the project inside and outside during t stage in the process of innovation, and {ξ0, ξ1, …, ξT−1} are independent from each other; ut is the choice decision of the project in stage of starting time. So, when the t stage is completed, the state variable of project can be expressed as [10]
Nature 1 A decision-making problem of a technical innovation project is considered under fuzzy environment:
Proof. Assume in two cases that the initial state variables of project equal, that is, , because Xt and are fuzzy variables of (Θ, P(Θ), Pos) on possibility space. According to hypothesis in t − 1 phase, for all θ ∈ Θ, we have . Assume in t − 1 phase situation 1, decision makers take u* as the optimal decision, and then in the t stage by Santiago and Vakili [10] model, we can get
2.3.2. Fuzzy Expected Value, Variance
According to Liu [8] and E(ξ) = 0, then the variance is V[ξt] = E[(ξt − E[ξt]) 2]. The variance of V[ξt] can be used as a measure of fuzzy degree of uncertainty of technical innovation project. If V[ξt] is smaller, then the fuzzy uncertainty is smaller. The solvent of fuzzy uncertainty can be reflected by the cumulative value of technical innovation project. Assumed in the of the initial state item variables is Xt, at the end of t phase and the initial time of t + 1 stage, the fuzzy uncertain factors ξt of t phase are solved, and the state variables of project will change to Xt + k(ut) + ξt. ξt shows the fuzzy uncertainty of the project in the phase under internal and external environment. It includes the technical risk during the process of project development, the evaluation of the project′s profitability made by the project team, the external market information of project, and other aspects.
2.3.3. Development Costs and Market Returns
Huchzermeier and Loch [6] show the benefit function: if the performance level is XT at the moment of T, it will generate the expected market return Πi. According to the different actual investment situations, we can also extend the conclusion to fuzzy random environment, rough fuzzy environment, and so on. For example, under fuzzy random environment, when the variables of product state are XT(θ), the expectation obtained by fuzzy stochastic market returns Π(XT) can also be presented in this way.
Definition 2.1. Let ξ be a fuzzy random variable, and then one has a finite expected value E(ξ), V[ξ] = E[(ξ−E[ξ])2] that is called fuzzy variable ξ variance.
From the previous discussion, when the product state variable is XT(θ), the expectation of fuzzy stochastic market returns Π(XT) is obtained by
Therefore, a double-fuzzy environment and rough fuzzy environment are similar to be launched.
2.3.4. The Dynamic Programming Model of Technological Innovation Project
The discussion of Santiago and Vakili [10] and Sheng [7] also gives a property of value function under the stochastic uncertainty environment; the following is the promotion under fuzzy environment.
Nature 2 Assuming the technology innovation project of state variables is indicated by x under fuzzy environment, if the expected market return function E[Π(x)] is nondecreasing, then the value of the function Vt(x) (t = 0,1, …, T − 1) of technical innovation project in any stage is non-decreasing too.
Proof. In reference Santiago and Vakili [10], if Vt+1(x) is non-decreasing, we assume that Vt+1(x) is nondecreasing; for two project state variables x1 and x2 of a given t phase, if x2 > x1, then we only need to prove Vt(x2) ≥ Vt(x1). Assuming that at t phase, the project of state variable is x1, selecting the optimal decision u*, makes the enterprise obtain the maximum Vt(x1). When the state variable of t phase is x2, the taken decisions u* make enterprises get the project value ; then consider the following;
- (1)
If u* is “continue” or “improved,” we have
() - (2)
If u* is “gives up.” . Because ξt is a fuzzy variable, so, x1 + k(u*) + ξt and x2 + k(u*) + ξt are fuzzy variables. If x2 > x1, we have x1 + k(u*) + ξt > x2 + k(u*) + ξt. Because Vt+1(x) is monotonicity, we have
()
Nature 3 From the aforementioned, we also can get that under fuzzy environment, if the optimal decision selected by the decision maker is “give up,” when the state variable is x during the state of t and when the variable is less than x, the optimal decision is “give up” too.
3. Conclusion
Combining the dynamic programming method and option analysis method, we make analysis of flexible decision problems of enterprise technological innovation investment, under fuzzy environment, mainly introducing fuzzy factors based on the model of Huchzermeier and Loch [6], Santiago and Vakili [10], Dixit and Pindyck [9], Sheng [7], and so forth. We establish the model, focus on the promotion of the Huchzermeier and Loch model under fuzzy environment, establish models of two-phase, multi-stage dynamic programming decision and make some analysis, and then draw valuable conclusions. But it only extends the models of Huchzermeier and Loch and Santiago and Vakili [10] to the fuzzy environment; in fact, this kind of promotion can also be extended to the fuzzy random environment and rough fuzzy environment. Although some attempt has been made, it is still not enough. This is what we should try our best in during the next step.