Volume 2014, Issue 1 618719
Research Article
Open Access

Rock Load Estimation in Development Galleries and Junctions for Underground Coal Mines: A CMRI-ISM Rock Mass Rating Approach

Avinash Paul

Corresponding Author

Avinash Paul

CSIR-Central Institute of Mining and Fuel Research, Dhanbad 826 015, India cmriindia.nic.in

Search for more papers by this author
V. M. S. R. Murthy

V. M. S. R. Murthy

Mining Engineering Department, Indian School of Mines, Dhanbad 826004, India ismdhanbad.ac.in

Search for more papers by this author
Ajoy Kumar Singh

Ajoy Kumar Singh

CSIR-Central Institute of Mining and Fuel Research, Dhanbad 826 015, India cmriindia.nic.in

Search for more papers by this author
First published: 09 March 2014
Citations: 4
Academic Editor: Manoj Khandelwal

Abstract

Rock mass rating (RMR) plays important role in design and selection of support system (Ghosh, 2000). For stability assessment of rock mass it is very important to know the amount of rock load mobilized around the development gallery which is estimated using RMR (Singh et al., 2003, Barton et al., 1974, Bieniawski, 1984, and Ghosh et al., 1992). In Indian coal mines, Central Mining Research Institute-Indian School of Mines rock mass rating (herein after referred to as CMRI-ISM RMR) is mostly used for formulating design guidelines for supports. In this paper an attempt has been made to correlate CMRI-ISM RMR values and rock load of galleries and junctions for different gallery widths, ranging from 3.6 m to 4.8 m, at different densities of roof rocks. The proposed empirical expression can help in quick design of support system for underground coal mines working in the same regime.

The full text of this article hosted at iucr.org is unavailable due to technical difficulties.