3R. UzsoyC.-Y. LeeL. A. Martin-VegaA review of production planning and scheduling models in the semiconductor industry Part I,
IIE Trans. Scheduling Logistics, 24 (4): 47–60, 1992, and Part II: Shop floor control,
IIE Trans. Scheduling Logistics,
26:
44–45,
1994.
8P. R. KumarT. I. SeidmanDynamic instabilities and stabilization methods in distributed real-time scheduling of manufacturing systems,
IEEE Trans. Autom. Control,
AC-35:
289–298,
1990.
10S. C. H. LuD. RamaswamyP. R. KumarEfficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants,
IEEE Trans. Semicond. Manuf.,
7:
374–388,
1994.
Please check your email for instructions on resetting your password.
If you do not receive an email within 10 minutes, your email address may not be registered,
and you may need to create a new Wiley Online Library account.
Request Username
Can't sign in? Forgot your username?
Enter your email address below and we will send you your username
If the address matches an existing account you will receive an email with instructions to retrieve your username
The full text of this article hosted at iucr.org is unavailable due to technical difficulties.