Incorporating Overconfidence into Real Option Decision-Making Model of Metal Mineral Resources Mining Project
Abstract
As for uncertainties and decision-makers’ overconfidence psychological bias, overconfidence has been incorporated into real option decision-making model of metal mineral resources mining to estimate its effect on decision-making of the project and thus a behavioral real option decision-making model of metal mineral resources mining based on overconfidence has been established. Furthermore, numerical simulation and sensitivity analysis have been conducted to verify the practicality of the model. Results show that model in this paper has greatly changed trigger value and option value of mineral resources mining project compared with traditional real option model, thus greatly changing optimal decision results. Incorporating overconfidence into real option decision-making model of metal mineral resources development is a crucial extension of project evaluation theory.
1. Introduction
Metal mineral resources are essential base material and important strategic supplies in economic development. Metal mineral resources mining project bears large budget, long construction cycle, and high risks and it is influenced by external factors including metal mineral market supply and demand, technological progress and policies, and internal factors including decision-maker’s working capacity and psychological bias, which could take effect on evaluation of metal mineral resources mining project [1]. This makes it difficult to evaluate metal mineral resources mining project by traditional DCF method accurately. Recently, with considerable researches in this field, real option approach (ROA), which is firstly brought up by Myers and Turnbull [2] and Ross [3], has been generally accepted as an appropriate method to help make decisions of metal mineral resources mining under uncertain circumstances. Brennan and Schwartz [4] initiated ROA into copper mining project, Smith and Nau [5] and Smith and McCardle [6] analyzed hydrocarbon resource development project by using dynamic programming and option pricing. Lately, scholars tend to investigate relationship between investment decision making and uncertain factors, operation cost uncertainty [7], production uncertainty [8], full-cost uncertainty [9], and exchange rate uncertainty [10, 11], have become vital factors which have expanded ROA model.
In the literature, ROA is increasingly applied to study metal mineral resources mining by scholars, but there still exists a widespread problem. In real option theory, scholars generally presume investment decision-makers are completely rational; ROA model only considers external uncertainties and ignores internal uncertainties factors including overconfidence, risk preference, and herd effect existing in economic activities [12, 13]. On the premise of investors’ limited rationalities, real market scenes can hardly be simulated through experiment and results of investors’ transaction accounts are often not representative [14]. Therefore, incorporating heterogeneous beliefs into real option model is of great significance, amongst which overconfidence is a prior. In fact, a great number of behavioral finance literatures have demonstrated that overconfidence bias of decision-makers takes great effect on investment decisions. Cooper et al. [15] and Russo and Schoemaker [16] proved that both entrepreneurs and managers showed overconfidence; Odean [17] made a comparison between investment decisions made by rational and overconfident managers and it turned out that overconfident managers tended to accept earlier investment; Hao et al. [18] through empirical approach analyzed relationship between overconfident CEO and investment. Results showed that overconfident CEO was more likely to conduct inefficient allocation of overinvestment. In incorporating overconfidence to real option theory, Hu and Ye [19] concentrated on uncertainties caused by the managers and revised the “approximate twin securities” approach, thus improving traditional real option evaluation. Throughout the abovementioned literatures, researches which incorporated overconfidence bias into real option model are at premium. A few studies have focused on qualitative analysis and very few scholars conducted quantitative analysis on impacts of overconfidence exerted by real option evaluation.
Therefore, aiming at this relatively blank field, overconfidence is incorporated into a real option decision-making model of metal mineral resources mining project in this paper and “twin security” is applied to build a connection between real option and overconfidence psychological bias. Since the ubiquitous overconfidence in decision-makers can change their estimation of expected growth rate and volatility of project value, the changes will take effect on the option pricing through the abovementioned key factors. On these premises, this paper establishes a behavioral real option price model and lists the numerical result of the model. In the context of China’s metal mineral resources mining projects, overconfidence of decision-makers ought to be incorporated into real option model, which could help make metal mineral resources investment decisions more precisely.
This paper is organized as follows. Section 2 establishes the model; Section 3 provides numerical results and discussions; Section 4 presents the concluding comments and final discussion.
2. Establishment of Model
2.1. Basic Assumptions
Uncertainties such as irreversibility and capability to defer contribute to real option value. But since there exists no real option trading market, it is impossible to apply a standard financial option pricing model to price real option. Fortunately, theoretical study by Mason and Merton [20] indicates once a “twin security” which bears the same risk features as the project can be found in the stock market, method of a standard option pricing model can be applied to derive real option pricing model under the same assumptions as standard DCF method. Since the existence of a “twin security” requires a standardized market and the same risk and distribution features as the project to be evaluated, it is difficult to find a “twin security” for a project whose underlying asset is not tradable [21]. But as for metal mineral resources mining project, its underlying asset is tradable in standardized active stock market, for example, “LME copper futures market,” which makes the metal mineral products standardized and tradable; additionally, the price volatility of metal mineral future is consistent with the value of the mining project, which exhibits the same risk features. Furthermore, the price motion of metal mineral future is similar to the value of the mining project; that is, they follow geometric Brownian motion; thus, metal mineral futures can be applied as the “twin security” of the metal mineral mining project as evidenced by Hu and Ye [19] and Trigeorgis [22] and Zhu [23]. By using the combination of “twin security” and risk-free security, the yield features of relevant real option can be copied. Consequently, the real option model can be solved by the same way of option pricing initiated by Black-Scholes [24–26].
In addition, as a form of risky security, twin security will inevitably meet the basic features of the risky securities and traditional behavioral asset pricing theory based on overconfidence is generally built on the premise of risk stock market [27] and assumes price of risk security is a normal random variable. On the abovementioned analysis, we take metal mineral futures as the “twin security” of the metal mineral mining project, through which contact between twin security market volatility and cognitive volatility of overconfident investors can be established. Ultimately, information of twin security can be used to indicate the value and volatility of metal mineral resources mining projects under investors’ overconfidence conditions.
2.2. Model Construction
It is easy to prove that , so the overconfident investment decision-makers underestimate the volatility of metal mineral resources mining project, thus generating great impact on decision-making.
2.3. Model Solution
Using numerical method, we can get value of P*. The abovementioned equations give the option value, project value, and boundary conditions in optimal investment; we can get trigger value to carry out the investment when investment decision-makers are overconfident.
3. Numerical Results and Discussions
3.1. Main Parameters
In order to apply the model to estimate the effect of overconfidence on trigger value V* and option value, a domestic copper mining project has been considered with the value of technical and economic parameters as those presented in Table 1. The life span of the project is 20 years, initial investment cost is 9.3 billion yuan, the cost of production is 8967.54 yuan per ton, yearly production is 1,010,000 ton, and risk free rate is 3.48%.
Input parameters | Units | Value |
---|---|---|
Initial investment (I) | RMB billion yuan | 9.3 |
Cost of production (C) | RMB yuan/ton | 8967.54 |
Yearly production of copper ore (q) | Ton | 1010000 |
Risk-free interest rate (r) | % | 3.48 |
Twin security’s volatility (σθ) | % | 22.46 |
Noise factor’s volatility (σε) | % | 31.4 |
Overconfidence coefficient (ϕ) | Dimensionless | 0.5 |
Yearly convenience yield (δ) | % | 1.48 |
Life span of the project (L) | Year | 20 |
Initial price of copper | RMB yuan/ton | 28950 |
On the premise of the analysis, the copper futures in LME futures market are adopted as the “twin security” of the copper mining project and as for the projects that can find “twin securities” in stock market, the volatility of “twin securities” is often used to substitute that of real assets projects [22, 23]. Therefore, the volatility of copper futures in LME is applied to present the project twin security’s volatility σθ of copper mining project. σθ is extracted from LME copper price on daily basis from October 2003 to October 2013 [33]; from the data we get standard deviation of copper price during these ten years 22.46%; risk-free rate is one-year treasury rate in 2013 and convenience yield is 1.48%. The estimation of noise factor’s volatility σε is more subjective, since there is no publicly available information regarding it. Consequently, in this case, assume that σε = 31.4% is just a first approximation.
3.2. Numerical Results and Discussions
Since only when the project value exceeds the trigger value can the investment of the project be carried out, trigger value is the prior evaluation criteria. Additionally, option value presents the value to delay the project; it has also been taken into consideration as key evaluation criteria. The following data and analysis show how overconfidence coefficient affects optimal decision timing in the copper mining project.
3.2.1. Effects of Overconfidence Coefficient on Decision-Making
Impacts of overconfidence on project trigger value and option value are mainly focused in this paper; part of the numerical data is shown from Tables 2, 3, and 4. In order to decrease the possible error caused by subjective estimation, simulation results under different σε value are given as follows.
Overconfidence coefficient | Trigger value | Option value |
---|---|---|
0.05 | 3.995 × 1011 | 3.902 × 1011 |
0.10 | 4.144 × 1011 | 4.051 × 1011 |
0.15 | 4.258 × 1011 | 4.165 × 1011 |
0.20 | 4.353 × 1011 | 4.260 × 1011 |
0.25 | 4.434 × 1011 | 4.341 × 1011 |
0.30 | 4.505 × 1011 | 4.412 × 1011 |
0.35 | 4.568 × 1011 | 4.475 × 1011 |
0.40 | 4.625 × 1011 | 4.532 × 1011 |
0.45 | 4.677 × 1011 | 4.584 × 1011 |
0.50 | 4.724 × 1011 | 4.631 × 1011 |
0.55 | 4.767 × 1011 | 4.674 × 1011 |
0.60 | 4.807 × 1011 | 4.714 × 1011 |
0.65 | 4.843 × 1011 | 4.750 × 1011 |
0.70 | 4.878 × 1011 | 4.785 × 1011 |
0.75 | 4.909 × 1011 | 4.816 × 1011 |
0.80 | 4.939 × 1011 | 4.846 × 1011 |
0.85 | 4.967 × 1011 | 4.874 × 1011 |
0.90 | 4.993 × 1011 | 4.900 × 1011 |
0.95 | 5.017 × 1011 | 4.924 × 1011 |
1.00 | 5.040 × 1011 | 4.947 × 1011 |
Overconfidence coefficient | Trigger value | Option value |
---|---|---|
0.05 | 4.163 × 1011 | 4.070 × 1011 |
0.10 | 4.378 × 1011 | 4.286 × 1011 |
0.15 | 4.534 × 1011 | 4.442 × 1011 |
0.20 | 4.657 × 1011 | 4.564 × 1011 |
0.25 | 4.757 × 1011 | 4.664 × 1011 |
0.30 | 4.841 × 1011 | 4.748 × 1011 |
0.35 | 4.911 × 1011 | 4.818 × 1011 |
0.40 | 4.973 × 1011 | 4.880 × 1011 |
0.45 | 5.026 × 1011 | 4.933 × 1011 |
0.50 | 5.073 × 1011 | 4.980 × 1011 |
0.55 | 5.115 × 1011 | 5.022 × 1011 |
0.60 | 5.152 × 1011 | 5.059 × 1011 |
0.65 | 5.186 × 1011 | 5.093 × 1011 |
0.70 | 5.216 × 1011 | 5.123 × 1011 |
0.75 | 5.244 × 1011 | 5.151 × 1011 |
0.80 | 5.270 × 1011 | 5.176 × 1011 |
0.85 | 5.292 × 1011 | 5.199 × 1011 |
0.90 | 5.313 × 1011 | 5.220 × 1011 |
0.95 | 5.333 × 1011 | 5.240 × 1011 |
1.00 | 5.351 × 1011 | 5.258 × 1011 |
Overconfidence coefficient | Trigger value | Option value |
---|---|---|
0.05 | 4.330 × 1011 | 4.237 × 1011 |
0.10 | 4.597 × 1011 | 4.504 × 1011 |
0.15 | 4.776 × 1011 | 4.683 × 1011 |
0.20 | 4.908 × 1011 | 4.815 × 1011 |
0.25 | 5.010 × 1011 | 4.917 × 1011 |
0.30 | 5.092 × 1011 | 4.999 × 1011 |
0.35 | 5.158 × 1011 | 5.065 × 1011 |
0.40 | 5.213 × 1011 | 5.120 × 1011 |
0.45 | 5.260 × 1011 | 5.167 × 1011 |
0.50 | 5.300 × 1011 | 5.207 × 1011 |
0.55 | 5.335 × 1011 | 5.242 × 1011 |
0.60 | 5.366 × 1011 | 5.273 × 1011 |
0.65 | 5.393 × 1011 | 5.300 × 1011 |
0.70 | 5.417 × 1011 | 5.324 × 1011 |
0.75 | 5.439 × 1011 | 5.346 × 1011 |
0.80 | 5.458 × 1011 | 5.365 × 1011 |
0.85 | 5.476 × 1011 | 5.383 × 1011 |
0.90 | 5.492 × 1011 | 5.399 × 1011 |
0.95 | 5.506 × 1011 | 5.413 × 1011 |
1.00 | 5.520 × 1011 | 5.427 × 1011 |
- Note: when overconfidence coefficient is 1, it means that investment decision-maker bears no overconfidence. Since it has no negative effect on the model, the data has been kept for further illustration.
Since the metal mineral resources mining project is faced with great uncertainty, the trigger condition of the project is that the value of metal mineral mining project exceeds the trigger value. Therefore, according to Table 2 to Table 4, we can figure out the following.
(1) Owing to the existence of overconfidence, investment decision-makers are too optimistic about market price and thus they will carry out the project when project value is beneath proper trigger value. The model also echoes from another perspective that overconfident investment decision-makers tend to implement project earlier which has been proved by Odean [17] and Sarkar [34], thus increasing the possibility of failure.
(2) As overconfidence coefficient grows, namely, overconfidence level decreases, trigger value of the project is increasingly getting close to 5.351 × 1011 (when σε = 0.314); in other words, the conclusion can be interpreted as with increase of overconfidence level; overconfident decision-makers will underestimate the trigger value to a greater extent; possibility to carry out the project earlier is growing as well as the risk of fault investment decision.
(3) The estimation of option value by overconfident decision-maker is lower than that of rational decision-maker, which means that overconfident decision-maker bears the belief that the present metal mineral price is high so the option value to defer the project is relatively low and there is no need in waiting for new opportunities.
(4) The overconfidence coefficient shows positive correlation with project option value. As the overconfidence coefficient increases, the investment decision-maker will underestimate the option value to a greater extent. Overconfident decision-maker thinks that the project’s delay option value is not high; they tend to give up waiting for new market opportunity and carry out the metal mineral resource mining project earlier.
Figures 1 and 2 show, respectively, impact of overconfidence coefficient on trigger value and option value under different noise factor volatilities. From Figure 1, it can be concluded that, when overconfidence coefficient increases or decreases 1% from 0.1, trigger value will change −0.845% and 0.794%, respectively; when overconfidence coefficient increases or decreases 1% from 0.5, trigger value will change −0.176% and 0.172%, respectively; when overconfidence coefficient increases or decreases 1% from 0.9, trigger value will change −0.077% and 0.076%, respectively. Therefore, in the interval where the overconfidence level is high, the overconfident investment decision-makers will underestimate the trigger value to a greater extent and thus overconfidence generates greater impacts on decision-making. When overconfidence coefficient gets close to 1, estimation error is approximately 0.


Figure 2 indicates that overconfidence coefficient and the option value show positive correlation. When overconfidence coefficient increases or decreases 1% from 0.1, the option value will change −0.86293% and 0.81135%; when overconfidence coefficient increases or decreases 1% from 0.5, the option value will change −0.17967% and 0.17546%; when overconfidence coefficient increases or decreases 1% from 0.9, the option value will change −0.07906% and 0.07782%. This on the one hand shows that, due to investment decision-maker’s overconfidence, option value of project is underestimated by the decision-maker; on the other hand, it indicates that in the interval where the overconfidence level is high, impact of overconfidence to option value is greater and vice versa. When overconfidence coefficient gets close to 1, the option value of the model gets close to the value when the investment decision-maker is not overconfident.
3.2.2. A Comparison Analysis of Numerical Results between the Proposed and DCF Approach
In order to clarify the different effects of the proposed and classic approaches on decision-making and exhibit the superior performance of the proposed model, comparison studies of the real option decision-making model which incorporates overconfidence and classic DCF method, Black-Scholes formula based model, Monte Carlo based model has been presented.
Table 5 shows evaluation results between the DCF and the real option method. The net present value of copper mining project by traditional DCF method is 7.867 × 1011; therefore the project is feasible and should be immediately carried out. Conversely, the evaluation result by RO method indicates that immediate investment is not an optimal decision, because it means the investment decision-maker gives up the delay option value 4.980 × 1011. Even if price uncertainty and overconfidence brings up the project value, a delay investment is an optimal decision.
Method | Feature | Trigger value | Option value | Investment decision |
---|---|---|---|---|
Traditional DCF | Ignoring uncertainty and investment flexibility | 9.300 × 109 | — | Make investment immediately |
Proposed model (ϕ = 0.5) | Incorporating uncertainty and investment flexibility into the model | 5.073 × 1011 | 4.980 × 1011 | Delay investment |
Therefore, DCF method cannot reflect the uncertainty and investment flexibility, which means an ignorance of the option value of the copper mining project, while, as for the proposed model which takes the price uncertainty and overconfidence into the real option model, the delay option value reflects such added value brought by these uncertainties.
3.2.3. A Comparison Analysis of Numerical Results between Traditional Black-Scholes Formula Based and the Proposed Model
The simulation results of traditional BS formula based and the proposed model of this copper mining project are shown in Table 6.
Method | Feature | Trigger value | Option value | Investment decision |
---|---|---|---|---|
Traditional BS model | Ignoring investment maker’s overconfidence bias | 5.838 × 1011 | 5.745 × 1011 | Wait and delay investment |
Proposed model (ϕ = 0.5) | Incorporating overconfidence into the model | 5.073 × 1011 | 4.980 × 1011 | Early investment* |
- Note: *denotes that the evaluation result is compared with the investment decision made through traditional BS approach.
Table 6 exhibits the evaluation results of traditional BS based formula and the proposed model. As can be seen in Table 6, option value of the model which incorporates overconfidence is beneath that of the traditional real option model with no overconfidence bias (5.745 × 1011); therefore the proposed model proves that overconfident decision-maker usually underestimates the delay option value and loses the opportunity to wait for better market information, thus resulting in early investment compared with the evaluation results of traditional BS approach. On the other hand, the trigger value of the project in new model is below that of traditional BS model since overconfidence bias contributes to the optimistic estimation of the market price of metal mineral so overconfident decision-maker often exercises the project when the value does not exceed proper trigger value. Overconfident decision-maker bears higher risks in making fault investment decisions.
3.2.4. A Comparison Analysis of Numerical Results between the Proposed and Monte Carlo Based Model
The copper mining project can be understood as an American option; the following part gives the option pricing results based on Monte Carlo simulation [34]. According to the previous parameters and results, the initial price of the real option is 7.87 × 1011 yuan and the exercise price of the real option is 9.3 × 109; all the other necessary parameters can be obtained in Table 1. We take 1000 simulation sample paths and divide each discrete time interval into 20 steps which added to 400 steps for each path. Part of the simulation result is shown in Figure 3.

Comparison of the evaluation results between Monte Carlo based model and the proposed model is presented in Table 7. It shows that overconfident decision-maker underestimates the option value of the copper mining investment project, which means an underestimation of the value to wait for new market information. This evaluation result is consistent with the results in previous part. In addition, the comparison shows that our proposed model can determine the optimal timing of copper mining investment project, while the traditional Monte Carlo simulation cannot solve it, which also reflects the superiority of the proposed model.
Method | Feature | Trigger value | Option value | Investment decision |
---|---|---|---|---|
Monte Carlo based model | Optimal investment timing cannot be obtained | — | 5.562 × 1011 | Wait and delay investment |
Proposed model (ϕ = 0.5) | Optimal investment timing can be obtained | 5.073 × 1011 | 4.980 × 1011 | Early investment* |
- Note: *denotes that the evaluation results are compared with the investment decision made through traditional Monte Carlo based approach.
3.3. Sensitivity Analysis
In order to ensure the stability of model, sensitivity of main parameters in this paper is conducted; results are shown in Figures 4 and 5. From the two figures, trigger value is the most sensitive to convenience yield, which is consistent with traditional conclusion and this ensures the stability of the model. In this paper, when convenience yield decreases or increases 1% from 3.48%, it will contribute to 83.2% and −38.73% change in the trigger value; it should be noted that, as convenience yield goes up, its impact on trigger value goes down. The newly incorporated parameters in this paper, that is, overconfidence coefficient, noise factor volatility, and twin security volatility, also take effect on trigger value as analyzed in the previous chapter. When noise volatility goes up or down 1% from 31.4%, the trigger value changes −0.176% and 0.172%, respectively, while the sensitivity of trigger value to twin security volatility falls in the interval between overconfidence coefficient and noise factor volatility.


Figure 6 exhibits that, when risk free rate increases, trigger value increases and vice versa. When risk-free rate decreases or increases 1% from 2.48%, the trigger value changes −19.056% and 13.7214%, respectively; when risk-free rate decreases or increases 1% from 4.48% the trigger value changes −7.87% and 5.7385%, respectively. Comparatively, the sensitivity of trigger value to overconfidence coefficient is lower than that to convenience yield. Figure 7 also shows that the sensitivity of trigger value to risk-free rate is lower than that to convenience yield.


In order to estimate the effect of main parameters to option value of the model, the sensitivity analysis of option value to overconfidence coefficient, convenience yield, noise factor volatility, and twin security volatility has been given. Results show that option value presents the greatest sensitivity to convenience yield among the input parameters. Figure 8 shows relatively higher convenience yield can decrease the option value to defer. When overconfidence coefficient takes 0.5, convenience yield decreases or increases 1% from 2% and option value changes 164.22% or −50.61%; while when convince yield is 1.48%, when overconfidence coefficient decreases or increases 1% from 0.1, the option value just changes −0.86293% and 0.81135%, respectively. Figure 9 shows that both higher noise factor volatility and twin security volatility add the delay option value in the proposed model, which is consistent with traditional research findings, while the sensitivity levels to the two factors are quite close.


4. Conclusion
This paper considers the shortage of traditional real option approach when making investment decisions of metal mineral resources mining project and establishes a behavioral real option decision-making model which is incorporated with overconfidence. Finally, analytical solution of the model has been given. To further illustrate the theoretical value and practical significance of the model, we use the data of a domestic copper mining project to conduct example and sensitivity analysis; results show the following. (1) Overconfidence is an important factor in decision making of metal mineral resources mining projects and, according to the results of the model, overconfident investment decision-makers will underestimate trigger value of the implementation of the project and the greater the degree of overconfidence is, the greater the degree of underestimation of the trigger value will be. Therefore when decision-makers show overconfidence bias in reality, optimal investment value of project should be higher than the trigger value assessed by the overconfident investment decision-makers so as to effectively avoid the risk brought by overconfidence. (2) Presence of overconfidence decreases uncertainty of metal mineral resources development investment since the overconfident decision-maker generally underestimates the volatility of the project value; consequently, the delay option value in metal mineral resources development investment increases as overconfidence coefficient increases. These findings echo previous study of Sarkar [34]. (3) Convenience yield of metal mineral resources is an important factor for evaluation of metal mineral resources project. Through sensitivity analysis of the model, it can be figured out that convenience yield generates the greatest impact on the valuation of metal mineral resource projects; relatively higher convenience yield will reduce the trigger value of mineral resources investment projects. While the convenience yield reflects the abundance of metal mineral resources, so it is important for overconfident decision-makers to consider the abundance of mineral resources when making a metal mineral resources development decision. Because high resource abundance of the project can bring higher investment income and offset the risk brought by decision-makers’ overconfidence to some extent.
Existence of overconfidence contributes to investment in advance and overinvestment into metal mineral resources market. These findings also provide a theoretical basis for phenomenon of excess investment in metal mining industry of iron and steel. But model in this paper shows some deficiencies; the paper fails to take cost uncertainty of metal mineral resources development and measurement of overconfidence into account. In future studies, it is not only meaningful to build a more realistic and accurate metal mineral resources investment decision-making model with the consideration of cost and other uncertainties, but also of theoretical value and realistic significance by incorporating overconfidence into real option models.
Conflict of Interests
The authors declare that there is no conflict of interests regarding the publication of this paper.
Acknowledgments
This work was partially supported by National Natural Science Foundation of China (NSFC) under Grant no. 71073177, Ministry of Education of International Financial Crisis Emergency Response Project under Grant no. 2009JYJR035, the National Natural Science Foundation of China (Grant no. 71171203), Major Project of National Social Science Foundation (Grant nos. 13 and ZD024 and nos. 13 and ZD169), the Ph.D. Programs Foundation of Ministry of Education of China (Grant no. 20130162110076), the Research Project in Humanities and Social Sciences of Chinese Ministry of Education (Grant nos. 13YJAZH149 and 09YJC90261), the Emergency Project of Chinese Ministry of Education (Grant no. 2009JYJR035), the Postgraduate Autonomous Exploration Innovation Fund of Central South University (Grant no. 2013zzts141), the China Postdoctoral Science Foundation (Grant no. 20110491264), the Special Project of Postdoctoral Research Funds of Hunan Province (Grant no. S2011R1040), and the Project of Soft Science of Hunan Province (Grant no. 2009ZK3193).