Volume 87, Issue 3 pp. 22-27
Article

Geologic Workflows: The Metamorphosis of the Great Rock

First published: 07 April 2017

Abstract

Creating a series of inspirational museum spaces inside an irregularly shaped void at the heart of a massive artificial rock formation is no everyday task. To fulfil the dream that had driven construction of the Great Rock at Budapest Zoo & Botanical Garden over a century ago, and to make the most of the space available, local firm PLANT – Atelier Peter Kis devised an innovative workflow that began with 3D scanning of the decaying concrete structure. Architect Péter Kis and landscape architect Sándor Bardóczi describe it.

The full text of this article hosted at iucr.org is unavailable due to technical difficulties.